Central Staircase Renovation
The Central Staircase that runs down the bluff to the lake has been repaired. Our most ambitious project to-date, our goal was to renovate the steps to last another 90+ years. Parks-approved contractor Joseph Suszek straightened and leveled 106 steps, replacing three entirely, removed old railings and replaced 70 posts with rails and hardware. Enjoy!
Marsh marigolds planted along the service drive, May 2021
Volunteer beach clean up, May 2021
Beach clean up March 2021
Beach Clean Up September 2020
We removed several truckloads of Driftwood from the beach
Many thanks to everyone who helped haul a huge amount of driftwood off the beach. It is now possible to get to the water’s edge without the danger of tripping over piles of driftwood. Enjoy all!